INDUSTRIAL PRODUCTS & CUSTOM ENGINEERINGRawang, Selangor · +603 6093 2828
Dancomair Engineering

Home / Projects / Storage equipment

FEATURED PROJECT

Storage equipment prepared for dispatch.

Fuel storage tanks fabricated, finished and tested at our Rawang factory, then prepared for transport to site.

IndustryPetrol & fuel storage
Location[to be confirmed]
ScopeFabrication, finishing, testing
StatusDelivered

THE CHALLENGE

What the customer needed.

[to be confirmed] Describe the customer’s requirement: capacity, liquid stored, site conditions, standards and deadline.

OUR SCOPE

What Dancomair delivered.

  • Design and drawings to the agreed specification
  • Fabrication and welding of the tanks
  • Shot blasting, coating and painting
  • Pressure and leak testing before dispatch
  • Preparation for transport to site

GALLERY

From the factory floor.

Real project photographs to be supplied by Dancomair.

Tanks on transport trailerFabricationTesting

SUPPLIED EQUIPMENT

Specification summary.

Figures to be completed from the project record.

ItemDetail
Tank type[to be confirmed]
Capacity[to be confirmed]
Quantity[to be confirmed]
Standard[to be confirmed]
VerificationPressure and leak test before dispatch

Customer name, location and results are published only with client approval.

Not sure which product fits?

Share your application, capacity and site conditions, and our engineers will recommend the right equipment.

Talk to an engineer ↗

SUSTAINABILITY & ESG

Responsible growth.

Our approach considers resource use, future facilities and the everyday working environment.

Speak to our team about the current status of these initiatives and our facility development plans.

Talk to the team →

DESIGN REVIEW

Dancomair homepage concept

The hero photograph is illustrative artwork from the supplied reference and does not identify a completed Dancomair project. Product, capacity, rating and support details on this page are taken from the current dancomair.com pages (Compression, Storage Tanks, Power Generation, BESS, Capability, After Sales Support) and should be re-checked against the latest published or approved specifications before launch. The group establishment year and listed standards come from Dancomair’s published About Us page; the Oil & Gas page gives a different incorporation year, so this needs client confirmation. Certificate validity, certified entities and product scope require confirmation before publication. Industry descriptions are proposed application content, not claims of completed projects. The "How we work" steps are proposed content and need client approval. Page sections follow the Website Page Purpose proposal: Products, Solutions, Industries, Capabilities and Projects.

The enquiry form prepares an email draft; it does not submit information to a server. A production form, privacy notice and approved specifications should be added before launch.

The BESS track record is attributed to the CD Power and IES group, not to Dancomair alone. Biogas FiT bonus wording, factory-visit information, ESG progress and any warranty claims require client approval.